Attributes as NumServiceTrips, ServiceKm are empty

Symptom Why are the attributes for operating indicators (e.g. "Number of service trips ..") not calculated? Resolution These attributes have to be calculated separately, using the procedure "PuT…

A PuT assignment leads to a program crash ("Runtime Error") or takes more runtime than expected.

Symptom A Headway- or Timetable-based assignment or a calculation of PuT skim matrices leads to a program crash ("Runtime Error") or takes more runtime than expected. Cause Possibly…

PuT Assignment : all paths start at 00:00 / Save paths as connections

Symptom After a timetable-based or headway-based assignment, all departure times are at midnight respectively 00:00:00. Resolution The term connection indicates a time-based information as to say the path…