You’re offline. This is a read only version of the page.
PTV Group
PTV GROUP
Toggle navigation
Knowledge Base
My Support
All
All
Cases
Knowledge Articles
Search Filter
All
Cases
Knowledge Articles
Search
English
English
Deutsch
Sign in
Home
Knowledge Base - Home
PTV Vissim - Dynamic assignment - Dynamische Umlegung
PTV Vissim - Dynamic assignment - Dynamische Umlegung
I have a simulation period about 24 hours (86400 seconds), after 4 hours no more vehicles will be generated.
What is the unit of the generalized cost function?
Zones need to load at two different parking lots
Build node structure... Node n
Is the cost of a route dependent only on travel time?
Convergence not achieved
Perform a matrix correction in PTV Vissim
Unassigned trips in OD matrix
View/edit routes
Abstract graph in the path file is not identical with the current one
Some paths could not be found
Adjust settings after achieving convergence for evaluation runs